Search the website

Search results

Search words under length of 3 characters are not processed.
204 results:
1. Sales partners  
Sales partners Germany DC-Software Doster & Christmann GmbH Konrad-Zuse-Platz 1 D-81829 München GERMANY Tel. +49-89-89 60 48 33 Fax +49-89-89 60 48 18 …  
2. DC-Underpinning  
20200037 DC-Underpinning Building underpinnings and retaining walls acc. to EC 7 / DIN 1054:2010 and 2005 / SIA 267 / OENORM B 1997-1-1 Building underpinnings and retaining walls acc. to…  
3. DC-Nail  
20200036 DC-Nail Soil nailing incl. wall design acc. to Eurocode 7 / DIN 1054:2010 and 2005 / SIA 267 / approvals Soil nailing acc. to Eurocode 7 (DIN EN 1997-1 with DIN 1054:2010, OENORM B 1997-1-1,…  
4. DC-Gabion  
20200032 DC-Gabion Analysis of gabions and supporting structures of layered blocks and concrete stack stones acc. to the bulletin of FGSV and Eurocode 7 / DIN 1054:2010 and 2005 / SIA 267 Gabions and…  
5. DC-Geotex  
20200031 DC-Geotex Reinforced earth with geosynthetics acc. to Eurocode 7 / DIN 1054:2010 and 2005 / SIA 267 / EBGEO 2010 Reinforced earth with geosynthetics acc. to Eurocode 7 (DIN EN 1997-1 with…  
6. DC-Integra  
20200039 DC-Integra Integrated foundation engineering: from the plan to the analysis Integrated Foundation Engineering From the plan to the analysis *** BIM for Foundation Engineering - from…  
7. DC-Pit  
20200034 DC-Pit Analysis of foundation pit walls (bore pile, diaphragm, sheet piling, girder plank walls, MIP) acc. to Eurocode 7 / DIN 1054:2010 and 2005 / DIN 4085 / SIA 267 / British Standard BS…  
8. DCPUMP  
20200021 DCPUMP Pump test graphic and evaluation Pump test graphic and evaluation Curve of sinking in the well up to 9 pertaining gauge levels in the diagram up to 9 customizable diagrams below…  
9. DCPUMP-Data logger  
20200072 DCPUMP-Data logger Interface to Aquitronic, Ott, Hydrotechnik, Seba, CSM, ASCII format and MS Excel, with filter function. Addition for DCPUMP: interface for the import of measurement…  
10. DCPUMP-Evaluation  
20200071 DCPUMP-Evaluation Approach foll. Chow resp. Jakob (sinking curve), Theis (rise) and Thiem (stationary state). Approach foll. Chow resp. Jakob (sinking curve), Theis (rise) and Thiem…  
Search results 1 until 10 of 204